EVBOOST ANALYTICS · UKRAINE
DC charging growth in Ukraine
How the EVBOOST catalogue of fast charging locations changes: monthly statistics, operators, manufacturers and power
A new record ≠ a new station. We count fast charging locations by the month they were added to the EVBOOST catalogue. How we count →
Added, removed and catalogue balance
Above zero: locations that appeared in the catalogue or came back; below zero: locations that likely left it and those that left with their whole network. The line is the catalogue balance per month — how much the number of operating records changed; the dashed line is how many were operating at the end of the month. A new catalogue record is not proof that a station opened, and a removal is not a confirmed closure.
- Added
- Likely left
- Likely left, estimated
- Left with their network
- Catalogue balance
- Operating at month end
- Likely left — the location disappeared from the operator’s data and did not come back within 14 days. We see only that, not the reason: the station may have been closed, dismantled or removed from the network. Closures in the last 14 days are not counted yet — the location may come back.
- Estimated (hatched) — before 16.10.2026 we did not record the moment a location disappeared, so we use its last status change. From that date closures are exact.
- Left with their network — a large part of an operator’s network disappeared within a week. This usually happens when an operator stops sending data, so these are not station closures. They are still records that left the catalogue, so the catalogue balance includes them.
- Added — the month a location first appeared in the EVBOOST catalogue. It is not the station’s opening date: a network may have been added to the catalogue later.
- Moves and re-created records do not change the count: a re-created location is counted once, at its first appearance.
New records by month
Locations by power class. * — the current month is not over yet.
- <40 kW
- 40–79 kW
- 80–149 kW
- 150–239 kW
- 240–349 kW
- 350+ kW
- Unknown
Filters
Period, operator, manufacturer and power apply to every chart and table. Click a month’s bar on the chart to show only that month.
Updating the figures…
What the selection shows
- 70.0%of the records for November 2026 (the month is not over yet) fall on two days: 10.11 — 11, 02.11 — 3. Most likely a bulk addition, not stations opening.
- 162records — the most in one month in the selection: October 2026.
- 31.6%of the records belong to Toka, the largest share among 15 operators and platforms.
- 32.7%of the records have DC from 150 kW (174 of 532).
Who drove the monthly spike?
Operators × months, number of records. The darker the cell, the more records — one scale for the whole table.
| Group | Jun 2026 | Jul 2026 | Aug 2026 | Sep 2026 | Oct 2026 | Nov 2026 | Total |
|---|---|---|---|---|---|---|---|
| Toka | 26 | 21 | 24 | 29 | 62 | 6 | 168 |
| ECOFACTOR | 19 | 64 | 10 | 1 | 61 | 0 | 155 |
| GO TO-U | 5 | 44 | 0 | 3 | 29 | 0 | 81 |
| EVA | 16 | 5 | 13 | 6 | 1 | 11 | 52 |
| ICar | 6 | 2 | 2 | 7 | 0 | 0 | 17 |
| Flash | 3 | 5 | 3 | 2 | 0 | 0 | 13 |
| EnergyUP | 0 | 5 | 4 | 0 | 1 | 1 | 11 |
| KM220 | 0 | 2 | 3 | 2 | 3 | 0 | 10 |
| UGV | 3 | 2 | 2 | 1 | 0 | 1 | 9 |
| Payment terminal | 1 | 0 | 0 | 0 | 4 | 0 | 5 |
| CloudPay | 2 | 1 | 0 | 0 | 1 | 0 | 4 |
| Booster | 0 | 1 | 0 | 1 | 0 | 0 | 2 |
| Yasno | 2 | 0 | 0 | 0 | 0 | 0 | 2 |
| Other | 0 | 1 | 0 | 0 | 0 | 1 | 2 |
| Ladergy | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
Operators
Records in the selection. One billing platform can serve several owners.
Choose an operator on the chart to open its profile.
Power structure
Share of power classes. Median: 90.0 kW; locations without stated power are hatched.
Manufacturers
Equipment currently installed at the locations. “Not specified” — the manufacturer is not in the catalogue; “Unknown manufacturer” — it could not be identified.
Added, removed and catalogue balance: exact figures
The same numbers as on the “Added, removed and catalogue balance” chart. Balance = added − likely left − left with network; it equals the change in operating records.
Months: added, removed, balance
| Month | Added | Likely left | of them estimated | Left with network | Balance | Operating |
|---|---|---|---|---|---|---|
| June 2026 | 83 | 13 | 13 | 1 | +69 | 1,917 |
| July 2026 | 153 | 17 | 17 | 76 | +60 | 1,977 |
| August 2026 | 61 | 12 | 12 | 0 | +49 | 2,026 |
| September 2026 | 53 | 17 | 17 | 40 | −4 | 2,022 |
| October 2026 | 162 | 13 | 11 | 137 | +12 | 2,034 |
| November 2026 * | 20 | 4 | 0 | 0 | +16 | 2,050 |
| Total | 532 | 76 | 70 | 254 | +202 | 2,050 |
Exact figures for the selection
The same numbers as on the charts.
Months × power
| Month | <40 | 40–79 | 80–149 | 150–239 | 240–349 | 350+ | Unknown | Total |
|---|---|---|---|---|---|---|---|---|
| Jun 2026 | 0 | 28 | 34 | 15 | 5 | 1 | 0 | 83 |
| Jul 2026 | 0 | 56 | 52 | 33 | 11 | 1 | 0 | 153 |
| Aug 2026 | 0 | 9 | 31 | 15 | 2 | 4 | 0 | 61 |
| Sep 2026 | 0 | 18 | 21 | 9 | 3 | 2 | 0 | 53 |
| Oct 2026 | 0 | 49 | 43 | 54 | 12 | 4 | 0 | 162 |
| Nov 2026* | 0 | 9 | 8 | 2 | 1 | 0 | 0 | 20 |
Operators × months
| Group | Jun 2026 | Jul 2026 | Aug 2026 | Sep 2026 | Oct 2026 | Nov 2026 | Total |
|---|---|---|---|---|---|---|---|
| Toka | 26 | 21 | 24 | 29 | 62 | 6 | 168 |
| ECOFACTOR | 19 | 64 | 10 | 1 | 61 | 0 | 155 |
| GO TO-U | 5 | 44 | 0 | 3 | 29 | 0 | 81 |
| EVA | 16 | 5 | 13 | 6 | 1 | 11 | 52 |
| ICar | 6 | 2 | 2 | 7 | 0 | 0 | 17 |
| Flash | 3 | 5 | 3 | 2 | 0 | 0 | 13 |
| EnergyUP | 0 | 5 | 4 | 0 | 1 | 1 | 11 |
| KM220 | 0 | 2 | 3 | 2 | 3 | 0 | 10 |
| UGV | 3 | 2 | 2 | 1 | 0 | 1 | 9 |
| Payment terminal | 1 | 0 | 0 | 0 | 4 | 0 | 5 |
| CloudPay | 2 | 1 | 0 | 0 | 1 | 0 | 4 |
| Booster | 0 | 1 | 0 | 1 | 0 | 0 | 2 |
| Yasno | 2 | 0 | 0 | 0 | 0 | 0 | 2 |
| Other | 0 | 1 | 0 | 0 | 0 | 1 | 2 |
| Ladergy | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
Manufacturers × months
| Group | Jun 2026 | Jul 2026 | Aug 2026 | Sep 2026 | Oct 2026 | Nov 2026 | Total |
|---|---|---|---|---|---|---|---|
| Not specified | 10 | 55 | 11 | 13 | 19 | 20 | 128 |
| ECOFACTOR | 16 | 30 | 6 | 0 | 28 | 0 | 80 |
| Sino | 12 | 15 | 17 | 8 | 4 | 0 | 56 |
| EVA Chargers | 16 | 7 | 10 | 6 | 2 | 0 | 41 |
| UGV Chargers | 10 | 5 | 4 | 5 | 6 | 0 | 30 |
| ABB | 0 | 1 | 1 | 5 | 21 | 0 | 28 |
| Beny | 3 | 9 | 0 | 2 | 14 | 0 | 28 |
| SINEXCEL | 1 | 4 | 2 | 0 | 19 | 0 | 26 |
| Eltis Master | 2 | 2 | 0 | 4 | 17 | 0 | 25 |
| Unknown manufacturer | 3 | 12 | 3 | 0 | 0 | 0 | 18 |
| Grasen | 0 | 2 | 2 | 1 | 5 | 0 | 10 |
| ND Group | 2 | 4 | 1 | 0 | 2 | 0 | 9 |
| EDS | 0 | 1 | 1 | 2 | 3 | 0 | 7 |
| Ecoline | 2 | 2 | 1 | 0 | 2 | 0 | 7 |
| Tary | 0 | 0 | 0 | 2 | 5 | 0 | 7 |
| Wall Box Chargers | 0 | 0 | 0 | 2 | 5 | 0 | 7 |
| China (manufacturer unknown) | 3 | 0 | 0 | 2 | 1 | 0 | 6 |
| ICG | 0 | 2 | 1 | 0 | 1 | 0 | 4 |
| KOSTAD | 1 | 0 | 0 | 1 | 1 | 0 | 3 |
| E4 | 2 | 0 | 0 | 0 | 0 | 0 | 2 |
| CIRCONTROL | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| Greemer | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| GreenLife | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| INGETEAM | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| MAXPOWER | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| SDEE | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| SIEMENS | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| StarCharge | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| Teison | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
| winline | 0 | 0 | 0 | 0 | 1 | 0 | 1 |
Manufacturers × power
| Manufacturer | <40 | 40–79 | 80–149 | 150–239 | 240–349 | 350+ | Unknown | Total |
|---|---|---|---|---|---|---|---|---|
| Not specified | 0 | 63 | 37 | 23 | 4 | 1 | 0 | 128 |
| ECOFACTOR | 0 | 15 | 37 | 23 | 5 | 0 | 0 | 80 |
| Sino | 0 | 14 | 27 | 9 | 2 | 4 | 0 | 56 |
| EVA Chargers | 0 | 13 | 25 | 2 | 1 | 0 | 0 | 41 |
| UGV Chargers | 0 | 2 | 10 | 13 | 5 | 0 | 0 | 30 |
| ABB | 0 | 27 | 1 | 0 | 0 | 0 | 0 | 28 |
| Beny | 0 | 2 | 5 | 13 | 6 | 2 | 0 | 28 |
| SINEXCEL | 0 | 0 | 10 | 16 | 0 | 0 | 0 | 26 |
| Eltis Master | 0 | 5 | 6 | 6 | 3 | 5 | 0 | 25 |
| Unknown manufacturer | 0 | 3 | 6 | 8 | 1 | 0 | 0 | 18 |
| Grasen | 0 | 0 | 4 | 3 | 3 | 0 | 0 | 10 |
| ND Group | 0 | 1 | 5 | 2 | 1 | 0 | 0 | 9 |
| EDS | 0 | 0 | 1 | 5 | 1 | 0 | 0 | 7 |
| Ecoline | 0 | 4 | 3 | 0 | 0 | 0 | 0 | 7 |
| Tary | 0 | 4 | 3 | 0 | 0 | 0 | 0 | 7 |
| Wall Box Chargers | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 7 |
| China (manufacturer unknown) | 0 | 5 | 1 | 0 | 0 | 0 | 0 | 6 |
| ICG | 0 | 2 | 2 | 0 | 0 | 0 | 0 | 4 |
| KOSTAD | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 3 |
| E4 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 2 |
| CIRCONTROL | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 |
| Greemer | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| GreenLife | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| INGETEAM | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 |
| MAXPOWER | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| SDEE | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| SIEMENS | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| StarCharge | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| Teison | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| winline | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
How we count
- What we count. Fast (DC) charging locations in Ukraine, by the month they were first added to the EVBOOST catalogue, including those that later left it. If an operator re-created the record of the same location, we count it once, at its first appearance. The date added is not the date a station opened: a network may have been added to the catalogue later or all at once as a large list.
- Location power. If the operator states the total power of the whole hub, we use it. If not and the location has several stations, we add up the maximum power of each station. If there is one station, we use its maximum power. When power is not stated, we show it as unknown.
- DC from 40 kW — locations with 40 kW or more under this rule.
- Operators and manufacturers — as they are in the catalogue now. Shares on the charts are shares of catalogue records, not market or ownership shares.
- What these data do not show. How many stations actually opened or closed in a month. A spike in a month often means a whole network was added to the catalogue.
Full methodology → · Current infrastructure by region → · Operators → · Manufacturers →
For media
How to cite: “According to the EVBOOST catalogue, [number] DC location records matching [filters] were added in [period], as of 15.11.2026.” This is not the number of newly opened stations. Please add a link to the methodology.
More analytics for charging network operators
Assess the competitive landscape, coverage and growth opportunities for your own network.
EVBOOST Pulse →